On January 27th, 2015, the pouring of concrete for the last dock floor of the dockyard in Haixin shipyard has been successfully completed, which remarks the node task for the dock floor has been finished and satisfies the basic requirement of the assembly of body section in shipyard. The dockyard was built by Jiangsu Haihong Construction Engineering CO.,LTD.